Getting a 400 kWh battery cabinet into a lab

A 400 kWh battery cabinet from XING Mobility for a university lab in Abu Dhabi, and the crane lift planned to get it in.

About the project

We didn't change the cabinet. We changed how it goes in.

XING Mobility builds the cabinet. We plan how it gets in: a site plan from XING's 3D models, the road from our facility in Dubai to the lab, the lift, the rebuild and the commissioning.

The plan: Four steps from our facility to the lab.

Arrive

The cabinet comes to our facility in Dubai first. We move it to Abu Dhabi from there.

Strip

The battery modules and some enclosure parts, doors included, come out to cut the weight on the hook.

Lift

A crane lifts the stripped cabinet into the lab.

Rebuild

Modules and doors go back in. We reconnect everything, commission the system and run the final site validation.